Tiny Home Site Preparation — What Do You Need Before Delivery?

Access, foundations and services are what decide whether delivery day runs smoothly. Here is what to have sorted before the truck leaves the yard.

1 min readDelivery & siteReviewed Sep 2026

The short version.

  • Access comes first

    The truck has to physically reach the placement zone. Overhead trees, narrow gates and tight corners all need a real look.

  • Get the base right

    Screwpiles or piers, concrete or skids — the right answer depends on slope, soil and how long the home stays put.

  • Plan services early

    Power, water and wastewater are the practical questions worth answering upfront, not on delivery day.

  • Councils still have a say

    Services, setbacks and local interpretation continue to shape what is sensible to build.

Site preparation is the part of a tiny home project that decides whether delivery day is calm or expensive. None of it is complicated, but almost all of it has to happen before the truck leaves the yard.

Start with access

Before anything else, walk the route the truck will take. A transportable home is wide, tall and heavy, and the constraint is almost never the site itself — it is the last hundred metres.

  • Overhead clearance: powerlines, branches and verandah rooflines.
  • Gateways and corners: width at the pinch point, not the average.
  • Ground conditions: soft ground after rain is the most common delay.
  • Turning space: where the truck will sit while the home is placed.

Choose the foundation

There is no single right answer. The decision comes down to slope, soil and how permanent the placement is.

  1. Screwpiles. Fast, no concrete, no spoil, and workable on uneven ground. Our usual recommendation.
  2. Concrete piers. Suited to firm, level sites where the home is staying put.
  3. Skids or blocks. Appropriate for genuinely temporary placements only.

Get services to the right place

Bringing power, water and wastewater to roughly the right spot before delivery saves the most time overall. Mark the connection points clearly so the placement crew can position accurately the first time.

We had the piles in and the water stubbed out a fortnight early. The home was on and connected the same afternoon.

Josie & Roy · Warkworth

What to have ready on the day

A short list, and it is the same list every time: clear access, a level and cured foundation, marked service points, and someone on site who can make a decision.

Questions about this topic.

Does my site need to be perfectly level?

No. Small variations are handled by the foundation system. Significant slope is worth discussing early, because it changes the pile design and the cost.

Will you need a crane?

Sometimes. Where the truck can reverse into position we place directly. Where access is restricted, a crane or hiab lift is used, and that is priced separately.

How far ahead should site prep start?

Aim to have foundations and service points ready two weeks before delivery. That leaves room for weather without moving the delivery date.